Rule Fire protection directive 21-15 Smoke and heat exhaust systems
Project review, acceptance, periodic inspection and maintenance
VKF-21-15-017
pragmaticBIM.ch/vkf-21-15-017
On request of the fire protection authority, projects are submitted for approval in good time. Systems with performance proof are accepted after an installation certificate exists, as are extensions and substantial changes.
Description
All systems are inspected periodically, with the interval depending on system type and protected object. Owners or operators ensure proper maintenance and constant readiness.
Source
VKF-Brandschutzrichtlinie 21-15 Rauch- und Wärmeabzugsanlagen (2015) (p. 11)
More rules for Fire protection directive 21-15 Smoke and heat exhaust systems
-
VKF-21-15-001
Smoke and heat exhaust by use, position and fire-compartment area
Depending on occupancy, number of storeys, construction type, position and use, fire compartments must be equipped with an adequately sized smoke and heat exhaust system.
-
VKF-21-15-002
Systems without performance proof: system type and sizing by use
For systems without performance proof the directive sets, per use, position and area, which system type is permitted: smoke clearance with fire-brigade fans, mechanical or natural systems. Sizing follows air-change rates by room height or supply and exhaust areas as a percentage of the compartment area.
-
VKF-21-15-003
Vertical escape routes: exhaust opening at the top, directly outdoors
Vertical escape routes get exhaust openings at the top leading directly outdoors: in low and medium-height buildings for accommodation, large occupancy and shops, in medium-height buildings for residential, office, industrial, commercial and school buildings and car parks, unless every storey has ventilation sashes...