Tapered insulation / roof build-up
ARC-ROOF-DRAIN
pragmaticBIM.ch/arc-roof-drain
Shows early how much build-up height the roof and balcony fall requires. The building height is then fixed for the permit, and pipes in the foundation can be connected to the outlets.
Description
- Insulation layer in the roof or balcony build-up that forms the fall for drainage.
- Used to coordinate falls, outlet positions, and connection to downpipes.
Modelling guidelines
- Model as a separate layer on flat roof and balcony; capture falls.
- Derive drainage points from the fall layout; do not forget the balcony.
- Provide emergency overflows for each roof in coordination with the sanitary designer; do not forget balconies and terraces with parapets.
- Do not model execution details such as gully types or individual insulation boards.
IFC entity
- IFC4
- IfcCovering
- IFC4.3
- IfcCovering
- IFC2x3
- IfcCovering
- Applicability rule
- entity_ifc4=IfcCovering AND PredefinedType=ROOFING AND IsExternal=TRUE
Attributes
| Attribute | Definition | Used in |
|---|---|---|
| PredefinedType |
Marks the tapered insulation. Allowed values
|
|
| Reference Pset_CoveringCommon |
Tapered insulation zone designation according to the coordination plan (e.g. flat roof north, balcony 2nd floor). |
|
| IsExternal Pset_CoveringCommon |
Marks exterior tapered insulation. Allowed values
|
|
| Status Pset_CoveringCommon |
Component status for coordinating work in existing buildings. Allowed values
|
+1 more |
| ElementStatus ePset_ElementStatus |
Component status for coordinating work in existing buildings. Allowed values
Note
|
+1 more |
| CostInterface ePset_Cost |
Cost interface: base building or tenant fit-out. Allowed values
|
|
| FundingApplication ePset_Cost |
Number of the funding application, so quantities and costs can be filtered by application. Separate several numbers with commas, e.g. |
|
| AwardInterface ePset_Cost |
Procurement package of the component, so interfaces between contractor packages become visible. Allowed values
|
|
| PlanningInterface ePset_Cost |
Planning interface of the component as a three-digit BKP code, so responsibilities between design disciplines become visible. Allowed values
|
|
| UnitPrice ePset_Cost · CHF/m² |
Project- or office-specific unit price per unit of the reference quantity, used to check component costs for plausibility. |
|
| ReferenceQuantity ePset_Cost |
|
|
| GlobalTradeItemNumber Pset_ManufacturerTypeInformation |
GTIN (Global Trade Item Number) of the product type; 8, 12, 13, or 14 digits depending on the GS1 structure. |
|
| SerialNumber Pset_ManufacturerOccurrence |
Serial number the manufacturer assigns to an individual product; with the GTIN it identifies the product passport for that specific item. |
|
| NetArea Qto_CoveringBaseQuantities · m² |
Net area of the modelled tapered insulation. |
Related elements
-
ARC-ROOF-OVERFLOW
Emergency overflow
Shows early where and at what level water leaves the roof when outlets are blocked, so the parapet, facade, waterproofing upstand, and structural load assumptions can be coordinated.
-
FURN
Furniture
Reveals early whether spaces can actually be furnished for their intended use and are adequately sized.
-
ARC-FURN-BUILTIN
Built-in furniture / kitchen
Shows early how much space the kitchen and built-in cabinets need and where the connections sit. Shop and installation design can check dimensions and connections against this.