Element

Tapered insulation / roof build-up

ARC-ROOF-DRAIN pragmaticBIM.ch/arc-roof-drain

Shows early how much build-up height the roof and balcony fall requires. The building height is then fixed for the permit, and pipes in the foundation can be connected to the outlets.

Tapered insulation / roof build-up (ARC-ROOF-DRAIN)

Description

  • Insulation layer in the roof or balcony build-up that forms the fall for drainage.
  • Used to coordinate falls, outlet positions, and connection to downpipes.

Modelling guidelines

  • Model as a separate layer on flat roof and balcony; capture falls.
  • Derive drainage points from the fall layout; do not forget the balcony.
  • Provide emergency overflows for each roof in coordination with the sanitary designer; do not forget balconies and terraces with parapets.
  • Do not model execution details such as gully types or individual insulation boards.

IFC entity

IFC4
IfcCovering
IFC4.3
IfcCovering
IFC2x3
IfcCovering
Applicability rule
entity_ifc4=IfcCovering AND PredefinedType=ROOFING AND IsExternal=TRUE

Attributes

PredefinedType

Marks the tapered insulation.

Allowed values

  • ROOFING - tapered insulation on flat roof and balcony
+3 more
Reference Pset_CoveringCommon

Tapered insulation zone designation according to the coordination plan (e.g. flat roof north, balcony 2nd floor).

IsExternal Pset_CoveringCommon

Marks exterior tapered insulation.

Allowed values

  • TRUE - tapered insulation on flat roof or balcony
Status Pset_CoveringCommon

Component status for coordinating work in existing buildings.

Allowed values

  • NEW - new build
  • EXISTING - existing
  • DEMOLISH - demolition
  • TEMPORARY - temporary
+1 more
ElementStatus ePset_ElementStatus

Component status for coordinating work in existing buildings.

Allowed values

  • NEW - new build
  • EXISTING - existing
  • DEMOLISH - demolition
  • TEMPORARY - temporary

Note

  • IFC2x3 substitute for Status.
+1 more
CostInterface ePset_Cost

Cost interface: base building or tenant fit-out.

Allowed values

  • GAB - base building (client / landlord)
  • MAB_{TenantName} - tenant fit-out, e.g. MAB_TenantA
FundingApplication ePset_Cost

Number of the funding application, so quantities and costs can be filtered by application. Separate several numbers with commas, e.g. 2024-0142, 2024-0188. Leave empty when the component belongs to no application.

AwardInterface ePset_Cost

Procurement package of the component, so interfaces between contractor packages become visible.

Allowed values

  • See the Procurement package value list. This Swiss data package uses three-digit BKP codes, e.g. 211, 221, 244.
PlanningInterface ePset_Cost

Planning interface of the component as a three-digit BKP code, so responsibilities between design disciplines become visible.

Allowed values

  • See the BKP planning package value list, e.g. 091, 092, 094.
UnitPrice ePset_Cost · CHF/m²

Project- or office-specific unit price per unit of the reference quantity, used to check component costs for plausibility.

ReferenceQuantity ePset_Cost

Qto_CoveringBaseQuantities.NetArea is the authoritative reference quantity for UnitPrice.

GlobalTradeItemNumber Pset_ManufacturerTypeInformation

GTIN (Global Trade Item Number) of the product type; 8, 12, 13, or 14 digits depending on the GS1 structure.

SerialNumber Pset_ManufacturerOccurrence

Serial number the manufacturer assigns to an individual product; with the GTIN it identifies the product passport for that specific item.

NetArea Qto_CoveringBaseQuantities · m²

Net area of the modelled tapered insulation.

+2 more

Related elements

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel