Document

Flooring schedule

BBO pragmaticBIM.ch/bbo

Room list by covering type, area, and perimeter as a verifiable basis for the flooring tender. The figures come from the interior spaces, not from a separate quantity take-off.

Contents

  • Room number and use
  • Intended floor covering per room
  • Tender-relevant area and perimeter length per room
  • Totals by covering type
  • Reference to the governing model status

More documents of this discipline

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel