Use case Design Costs & quantities

Determine topsoil quantities

DES-HUMUS pragmaticBIM.ch/des-humus

Represent topsoil as a layer that can be designed, so that stripping, reinstatement, and surplus quantities can be evaluated for cost and construction sequencing.

Starting point

  • Topsoil is cost-relevant and must be planned.

Goal & benefit

  • Derive quantities for stripping, reinstatement, intermediate storage, and surplus from the model.

Process

  1. Provide the topsoil layer for existing, stripping, and reinstatement.
  2. Keep the intermediate stockpile as a site-setup object.
  3. Evaluate quantities for the cost balance.

Deliverable

  • Landscape model with the topsoil layer
  • Intermediate stockpile in the logistics model
  • Balance: stripping = reinstatement + stockpile + surplus

Ways to do it

  • Civil 3D Autodesk editorial listing

    Civil and terrain design with digital terrain models and cut and fill quantities.

    Visit vendor · last checked

  • Vectorworks Landmark Vectorworks (Nemetschek) editorial listing

    CAD and BIM tool for landscape architecture with terrain model, plants and trees.

    Visit vendor · last checked

Suggest a tool All tools and services

Elements involved

More use cases for Costs & quantities

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel