Manufacturing and processing of goods. Reference quantity: output per year.

Boundary conditions

PG-25Process

The process and the output determine hall height, loads, material flow, and the number of workstations.

Variants

  • PRZ-01Manufacturing

    Parts are made from raw material, often with heavy machinery.

  • PRZ-02Assembly

    Parts are assembled into products.

  • PG-15Refit frequency

    How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.

Scenarios

US-GE-01Reaching the unit (Described under another use)

US-PR-06Reaching production

Staff and materials reach the production floors. The access arrangement determines loads, material flow, and separation of people and goods routes.

Variants

US-PR-01Manufacturing and assembly

Products are made in series or as one-offs. The manufacturing concept determines hall size, crane runways, and material flow.

Variants

US-GE-03Disposing of waste (Described under another use)

US-PR-02Checking quality

Parts and products are checked before delivery. The test environment determines indoor climate, vibration protection, and proximity to production.

Variants

US-GE-04Disposing of organic waste (Described under another use)

US-PR-03Delivering materials

Raw materials and semi-finished goods arrive by truck. Delivery determines yard area, stock levels, and routes to production.

Variants

US-PR-04Packing and shipping finished goods

Finished products are packed, staged, and collected. Shipping determines buffer areas and the separation of inbound and outbound goods.

Variants

US-PR-05Changing shifts

Staff put on and take off work clothes before and after each shift. Changing rooms determine hygiene, gender separation, and routes to production.

Variants