Accommodation
USE-BH
pragmaticBIM.ch/use-bh
Temporary overnight stay of guests, for example in hotels. Reference quantity: number of rooms.
Boundary conditions
PG-19Room mix
The room mix decides which guests the house can take in. The number of rooms and beds determines floor area, bathrooms, and housekeeping effort.
Variants
-
ZMX-01Single and double rooms
For business travellers and short stays.
-
ZMX-02Double rooms
For couples and holiday guests.
-
ZMX-03Double rooms and suites
For families and longer stays.
-
PG-18Fit-out state at handover
The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it.
Scenarios
US-BH-06Reaching the room
Guests reach their rooms with luggage while staff move linen and supplies between floors. The access arrangement determines step-free access, quiet, and separation of guest and service routes.
Variants
- Stairwell · Adds: Lobby, Stairwell
- Stairwell and elevator · Adds: Lobby, Stairwell, Elevator lobby
- Guest elevator and protected service lift · Adds: Lobby, Stairwell, Elevator lobby, Service lift
US-GE-01Reaching the unit (Described under another use)
US-BH-01Checking in
Guests arrive and gain access to their accommodation. The process determines reception area, staffing, and wayfinding.
Variants
- Staffed reception · Adds: Reception
- Direct self check-in · Adds: Hotel room
US-GE-02Using the toilets
Users and visitors need toilets during their stay, including wheelchair users. The split determines number, area, privacy between user groups, and how flexibly the toilets can be used.
Variants · Several can be selected
- Women's, men's, and accessible toilets · Adds: Female toilet, Male toilet, Accessible toilet
- All-gender toilets with accessible toilet · Adds: Unisex toilet, Accessible toilet
- Teachers', students', and accessible toilets · Adds: Teachers' toilet, Students' toilet, Accessible toilet
- Visitor, staff, and accessible toilets · Adds: Visitor toilet, Staff toilet, Accessible toilet
- No dedicated toilets
US-GE-03Disposing of waste (Described under another use)
US-BH-02Staying overnight
Guests sleep and stay temporarily in the accommodation. The room concept determines privacy, equipment, and area.
Variants
- Hotel room · Adds: Hotel room
- Hotel room with living room · Adds: Hotel room, Living room
US-BH-03Using bathroom facilities
Guests wash and care for themselves during their stay. Allocation determines privacy, travel, and room area.
Variants
- Private bathroom · Adds: Bathroom
- Shared shower room · Adds: Shower room
US-GE-04Disposing of organic waste (Described under another use)
US-BH-04Having breakfast
Guests have breakfast during their stay. The provision determines dining space, travel, and operating hours.
Variants
- Breakfast restaurant · Adds: Restaurant
- Cafeteria · Adds: Cafeteria
- External provision
US-BH-05Servicing rooms
Rooms are regularly cleaned and supplied with consumables. The service point determines travel, storage, and operations.
Variants
- Supply room · Adds: Supply room
- Caretaker's cupboard · Adds: Caretaker's cupboard
- External service
Use cases
-
DES-PHYSICSCreate the building physics requirements model
Translate the approved building physics concept into a spatially assigned requirements model so sound and thermal insulation can be checked unambiguously and continuously in the architecture model.
-
DES-SOUND-SIA181Derive SIA 181 sound insulation requirements from room use
Set the noise load and noise sensitivity of every room and derive the sound insulation requirement of every separating element from them, so missing or too low requirements between usage units show up before the tender.
-
DES-WALL-REQUIREMENTSCombine wall requirements from discipline reports
Combine fire protection and building physics requirements for each wall to create unambiguous requirement profiles and suitable wall types.
-
QAS-ACOUSTICCheck sound and thermal insulation on components
Automatically check the architecture model against the approved building physics requirements model so sound and thermal insulation deviations become visible after every relevant design change.
-
QAS-ELEMENT-PERFCheck component types against performance requirements
Check wall, slab, window, and door component types against the performance requirements that follow from the chosen framework conditions, so every type demonstrably meets what was ordered.
More uses
-
USE-VS
Assembly and culture
Gathering of audiences for events, culture and worship. Reference quantity: number of audience places.
-
USE-HE
Healthcare
Examination, treatment and care of patients. Reference quantity: number of beds.
-
USE-PR
Production
Manufacturing and processing of goods. Reference quantity: output per year.