pragmaticBIM Reference
Documents
Documents are the drawings, schedules and reports a project delivers. Each document names its contents and the elements it is derived from.
GLD
Terrain survey
Terrain survey with position and height reference in LV95 and control points. Binding spatial basis for all discipline models; complemented by the geotechnical report.
Surveyor
ANS
Elevations
Building elevations as the geometric and visual planning basis. They act as a completeness check against the IFC model - facade, openings, and junctions must be readable on the drawing.
Architecture
BGD
Building permit dossier
Complete building application submitted to the permitting authority, including forms, plans, reports, concepts, and project-specific evidence.
Architecture
BGA
Permit plans architecture
Architecture permit plans for the building application. Floor plans, sections, and elevations in the representation required by the authority.
Architecture
CRQ
Change requests
Change orders and variations. They prevent unplanned extra cost by coupling variations directly to the affected milestones and containers (project, site, building, storey).
Architecture
BBO
Flooring schedule
Room list by covering type, area, and perimeter as a verifiable basis for the flooring tender. The figures come from the interior spaces, not from a separate quantity take-off.
Architecture
BDG
Geotechnical report
Geotechnical report with subsoil, bearing capacity, and geotechnical recommendations. It complements the terrain survey and position reference as the basis for foundations, excavation, and strategy choice.
Architecture
DET
Details
Standard and execution details as the geometric planning basis. They close the gap between model and construction and act as a completeness check where the IFC model is not held at detail depth.
Architecture
FEN
Window schedule
Schedule of windows with window number, type, and dimensions as the basis for tender, coordination, and handover to operation.
Architecture
FMR
Funding report
Report on a construction project's funding applications with the associated measures, check results, contributions, and evidence. Basis for tracking from application through to payment.
Architecture
FUG
Joint layouts
Coordinated layout of movement, perimeter, and bay joints in the floor build-up as a basis for underfloor heating and construction.
Architecture
GRD
Floor plans
Storey floor plans as the geometric and visual planning basis, typically at scale 1:50. They act as a completeness check against the IFC model - the model is validated via IDS, the plans show whether the status is complete and readable.
Architecture
GRS
Floor plans, schematic
Schematic storey floor plans in early phases, often at scale 1:200 or 1:100. Placing a grey or black area behind the spaces allows floor plans to be produced without drawing the walls.
Architecture
IGR
IPD base reference
Contract-ready functional base reference with market-indexed reference costs as the basis for IPD award, fee calculation, and bonus settlement.
Architecture
KBE
Cost calculation
The cost calculation refines and details the cost estimate in line with the advanced technical design status and the more precise element-based quantity basis.
Architecture
KVA
Cost estimate
The cost estimate is based on the technical design status and element-based quantities. The cost accuracy of ± 25 % indicates the confidence in the underlying assumptions, not an allowable cost deviation; contingencies and escalation must be shown separately.
Architecture
LAY
Robotic layout file
Storey-wise layout file derived from the architecture model for robotic printing on the structural slab. It contains the lines and short texts to set out - not as a parallel 2D drawing, but as a derivation from the model status.
Architecture
LVP
Planning services specification
Contract-ready description of the planning services, results, and data deliveries expected when procuring a design team.
Architecture
LV
Bills of quantities
Bills of quantities for tender and award.
Architecture
NZK
Usage concept
Usage concept with prioritized usage scenarios, verifiable acceptance criteria, and operational assumptions. Binding basis for test planning, the room programme, and acceptance of design and construction.
Architecture
LFP
Delivery plan / IDP
A management instrument of project management. It sets which information is delivered in which container, in what form, by whom, and by when.
Architecture
PPL
Product-passport list
List of installed products using the GTIN and, where needed, the serial number as the key to the corresponding digital product passport. The contractor or supplier maintains and updates the data.
Architecture
BAP
Project handbook / BEP
Project handbook and BIM execution plan as a living management and working document. It is not intended to form part of the contract but is continuously developed based on knowledge gained throughout the project.
Architecture
PRT
Minutes
Meeting and decision minutes are preferably maintained as one continuous, living document. Current discussion items are highlighted for easy orientation, enabling contradictions to be identified early and content from the project handbook or BEP to be addressed directly and kept up to date.
Architecture
RMB
Room book
Continuously maintained data container for ordered room types, planning room types, room instances, and their requirements and deviations throughout the project.
Architecture
RPG
Room programme
Structured list of the rooms ordered at an agreed status, with a stable technical room number, ordered room type, and groupings. Binding basis for designer procurement, competition, and comparison with the model.
Architecture
RGR
Daywork reports
Daywork reports for time-and-material work. They prevent unplanned extra cost by coupling daywork directly to the affected milestones and containers (project, site, building, storey).
Architecture
SGG
Hazardous-material report
Report of hazardous-material findings in the existing building. Component-level type and remediation urgency are taken from it into the existing-building model.
Architecture
SCT
Sections
Building sections as the geometric and visual planning basis. They act as a completeness check against the IFC model - heights, layers, and vertical relationships must be readable on the drawing.
Architecture
GSK
Building security concept
Security concept with security zones, security levels, protection goals, and required burglary resistance classes. Binding basis for model values and insert models of critical areas.
Architecture
TL
Door schedule
Construction-ready schedule of all doors, gates, and inspection openings with the information required for ordering, fabrication, and installation.
Architecture
UVP
Environmental impact assessment
Environmental impact assessment of the project's effects on the environment and surroundings. Basis for the building application and alignment with the authority.
Architecture
VKG
Traffic study
Traffic study for access, parking, and effects on the surrounding network. Basis for the building application and alignment with the authority.
Architecture
WVK
Works contracts
Works contracts with contractors.
Architecture
WSP
Apartment schedule
Schedule per apartment with count, type, and gross and net residential area. Derived from gross volumes and net rooms and kept current when the design changes.
Architecture
DBA
Design-build functional tender basis
Client-side functional tender basis with requirements, indicative quantities, quality specifications, and price boundaries as the foundation for design-build awards with a binding offer price.
Architecture
APH
Heating execution drawings
Heating-system execution drawings with the routes, circuits, dimensions, and connections required for construction.
MEP
BGE
Permit plans electrical
Electrical permit plans for the building application. Representation of the electrical systems in the form required by the authority.
MEP
BGH
Permit plans heating
Heating permit plans for the building application. Representation of the heating systems in the form required by the authority.
MEP
BGK
Permit plans cooling
Cooling permit plans for the building application. Representation of the cooling systems in the form required by the authority.
MEP
BGC
Permit plans air conditioning
Air-conditioning permit plans for the building application. Representation of the air-conditioning systems in the form required by the authority.
MEP
BGL
Permit plans ventilation
Ventilation permit plans for the building application. Representation of the ventilation systems in the form required by the authority.
MEP
BGS
Permit plans plumbing
Plumbing permit plans for the building application. Representation of the plumbing systems in the form required by the authority.
MEP
BSM
Fire cause-and-effect matrix
Fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment. It ensures the safety matrix is formally approved before construction.
MEP
NVG
Usage agreement MEP
MEP usage agreement. It links agreed room-by-room requirements for heating, ventilation, air conditioning, plumbing, and electrical to the technical design status.
MEP
STG
Riser schematics / shafts
Riser schematics and shafts for building services. They ensure vertical distribution and shafts are formally approved before construction.
MEP
SYS
System and plant schematics (MEP)
MEP system and plant schematics (heating, ventilation, air conditioning, plumbing, electrical). They ensure building-services concepts are formally approved before construction.
MEP
WHB
Maintenance manuals
Asset-specific documentation for safe operation, inspection, and maintenance.
MEP
WVT
Maintenance contracts
Contracts for agreed asset maintenance over a defined term.
MEP
BWP
Reinforcement plans
Reinforcement plans for concrete execution. They make bars, layers, and positions readable for site.
Structural engineering
NVT
Usage agreement structure
Structural usage agreement to SIA 260. It links agreed uses, loads, and vibration requirements per space to the technical design status of the structure.
Structural engineering
SHL
Formwork plans
Formwork plans for concrete execution. They make formwork, dimensions, and junctions readable for site.
Structural engineering
BSK
Fire protection concept
Fire protection concept with protection goals, compartments, and required fire-resistance classes. Binding basis for the fire plan, model values, and permit.
Fire protection
BSP
Fire protection plan
Fire protection plan with compartments, escape routes, and fire resistance of the governing components. It supports alignment with the fire concept and permit documents.
Fire protection
BPK
Building physics component catalogue
Building physics component catalogue with values for the envelope and separating components. Basis for verification, variants, and coordination with architecture and specialists.
Building physics