Use case Design Costs & quantities
Visualize design interfaces
DES-PLANNING-INTERFACE
pragmaticBIM.ch/des-planning-interface
Carry design responsibility per component in the model and colour it - forgotten parts at design interfaces become visible.
Starting point
- Errors happen at the interfaces between design disciplines; components without clear design responsibility are easily lost.
- Lists and organigrams make gaps at design interfaces hard to see.
Goal & benefit
- Assign every architecture and MEP component to a BKP design package.
- Coloured plans make missing assignments and overlaps at the interfaces visible.
Process
- Provide architecture and MEP components in the discipline model.
- Set PlanningInterface to the three-digit BKP code of the design item.
- Derive visualization by design package and check for gaps.
Deliverable
- Architecture and MEP models with verifiable element assignment to the agreed design packages
- Visualization of missing or duplicated design responsibility
Ways to do it
-
BIMcollab Zoom BIMcollab editorial listing
IFC viewer and model checking with rules, colouring by properties and BCF issues.
Visit vendor · last checked
-
DESITE BIM thinkproject editorial listing
Model checking and analysis with property-based colouring and quantity takeoff.
Visit vendor · last checked
-
IFC-Lite LTplus AG editorial listing
Open-source IFC toolkit for browser, server and CLI to view, query, validate, edit and export models.
Visit vendor · last checked
-
Solibri Office Solibri (Nemetschek) editorial listing
Rule-based checking of IFC models for clashes, model quality and requirements.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (28)
+20 more
- Floor slab
- Flat roof
- Footing
- Non-load-bearing interior wall
- Load-bearing interior wall
- Column
- Pitched roof
- Beam / girder
- Exterior window
- Exterior door
- Interior window
- Interior door / inspection hatch
- Suspended ceiling
- Interior floor build-up
- Exterior floor covering
- Facade cladding
- Tapered insulation / roof build-up
- Furniture
- Built-in furniture / kitchen
- Interior wall cladding
MEP (34)
- Duct (schematic)
- Cable tray (schematic)
- Downpipe
- Chiller
- Cooling tower / free cooler
- Backup generator
- Electrical distribution board
- Transformer
+26 more
- Uninterruptible power supply
- Boiler / water heater
- District heat substation
- Compressed air compressor
- Gas pressure regulator
- Fan
- Tank / separator
- Pump
- Unitary equipment / monoblock
- Communications appliance
- Chilled ceiling / beam
- Radiator
- Air terminal / grille
- Air terminal box
- Light fixture
- Socket / data outlet
- Switch
- Damper
- Sanitary terminal
- Waste terminal
- Gas outlet
- Fire suppression terminal
- Valve / manifold
- Smoke detector / alarm
- Sensor
- Actuator
More use cases for Costs & quantities
-
DES-ELEMENT-COST-EARLY
Calculate element-based costs in early project phases
Combine component quantities and early unit rates into a traceable cost forecast while constructions and build-ups are not yet fully defined.
-
DES-ELEMENT-COST-LATE
Calculate element-based costs in late project phases
Develop the early forecast into a detailed cost calculation using calculated component types, refined quantities, and type-specific unit rates.
-
DES-APT-SCHEDULE
Prepare apartment schedule
Derive the apartment schedule from gross volumes and net spaces and update it reliably when the design changes.