Rule Fire protection directive 15-15 Fire safety distances, load-bearing structures, fire compartments

Installation shafts over several storeys: compartment-forming, at least EI 30

VKF-15-15-014 pragmaticBIM.ch/vkf-15-15-014

Building-services lines running over several storeys are in principle routed in installation shafts that themselves form fire compartments. The shaft enclosure matches the fire resistance of the use-related compartmentation, but at least EI 30.

Description

A shaft can be omitted where lines pass storey by storey through floors with penetrations made as in clause 3.5 or run in VKF-recognized wall systems. Not yet checkable: the model does not show which components enclose a shaft.

Source

VKF-Brandschutzrichtlinie 15-15 Brandschutzabstände, Tragwerke, Brandabschnitte (2015) (p. 9)

More rules for Fire protection directive 15-15 Fire safety distances, load-bearing structures, fire compartments

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel