Use case Design Costs & quantities
Calculate element-based costs in late project phases
DES-ELEMENT-COST-LATE
pragmaticBIM.ch/des-element-cost-late
Develop the early forecast into a detailed cost calculation using calculated component types, refined quantities, and type-specific unit rates.
Starting point
- As design advances, average rates per product class no longer suffice because build-ups, dimensions, and performance requirements materially change component costs.
- If quantities and types are created separately for costs, tendering, and life-cycle assessment, calculation states diverge and variances become untraceable.
Goal & benefit
- Calculate costs per component type using the build-ups and requirements actually designed.
- Attribute changes from the early calculation to quantity, type, or unit rate.
- Provide a shared type-based basis for tendering and life-cycle assessment.
Process
- Provide cost-relevant components with product class, cost-driving properties, reference quantity, and refined model quantities, then calculate the component type using rules.
- Assign unit rates per product class and calculated type from the approved cost database and calculate component costs as reference quantity × unit rate.
- Evaluate costs by component type, explain variances from the cost estimate, and update the price basis, contingencies, and total cost.
Deliverable
- Detailed element-based cost calculation by product class and component type
- Variance statement against the cost estimate with updated total cost
Ways to do it
-
AnkerDB AnkerDB AS editorial listing
The catalogue holds each component type's build-up with costs and CO₂; unmodelled work is added as virtual elements.
Visit vendor · last checked
-
BauPlus Heiniger & Partner AG editorial listing
Construction administration and AVA software for costs to BKP/eBKP, NPK tendering, award and measurement.
Visit vendor · last checked
-
CostX RIB Software editorial listing
Quantity take-off and cost estimating from 2D drawings and BIM models.
Visit vendor · last checked
-
iTWO 4.0 RIB Software editorial listing
Model-based cost planning, tendering and project control (5D).
Visit vendor · last checked
-
Messerli AVA Messerli Informatik editorial listing
AVA software for tendering, contract award and billing based on NPK.
Visit vendor · last checked
-
PROVIS Axept Business Software AG editorial listing
Swiss construction management and tendering software with IFC import, BIM viewer, eBKP/BKP costing and NPK tendering.
Visit vendor · last checked
-
SORBA AVA SORBA editorial listing
AVA software for tendering, contract award and billing based on NPK.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (26)
+18 more
More use cases for Costs & quantities
-
DES-ELEMENT-COST-EARLY
Calculate element-based costs in early project phases
Combine component quantities and early unit rates into a traceable cost forecast while constructions and build-ups are not yet fully defined.
-
DES-APT-SCHEDULE
Prepare apartment schedule
Derive the apartment schedule from gross volumes and net spaces and update it reliably when the design changes.
-
DES-URBAN-MASS
Create the urban design mass study
Model and evaluate gross volumes by storey so that urban design options and metrics can be compared directly.