Boundary condition Boundary conditions
Security / critical infrastructure
PG-12
pragmaticBIM.ch/pg-12
This framework condition determines how strictly information and building security are handled for critical infrastructure: which CDEs are allowed and whether security-critical areas and building security measures must be managed and checked on a model basis.
Variants
-
SIC-01Low
No particular critical infrastructure; any CDE may be used. No additional security workflows are activated.
-
SIC-02Medium
Elevated information-security requirements; only CDEs with data storage in Europe are allowed. No additional model workflows are activated.
-
SIC-03High
Critical infrastructure with dedicated isolated workspaces without internet access; keep security-critical areas in a separate insert model and verify building security measures against the model.
Activates: Keep critical areas as an insert model, Verify building security measures
Activated use cases
DES · Design
-
DES-CRIT-INSERTKeep critical areas as an insert model
Do not develop security-critical areas in the federated overall model; keep them in a separate insert model with restricted access.
QAS · Quality assurance
-
QAS-BUILD-SECVerify building security measures
Check the architecture model against the approved security concept so that security zones, protection data, and burglary resistance remain traceable.
More boundary conditions
-
PG-08
Procurement strategy
This framework condition determines the procurement route: engaging designers directly, a competition, design-build, or IPD. Each route places different demands on foundations, models, and bids.
-
PG-41
Construction during operation
This framework condition sets whether the building stays in use during construction. It drives phasing, temporary measures, decant space, and site logistics with separate routes for operation and construction.
-
PG-04
Facility management
This framework condition determines who operates the building and with which systems: space and equipment lists, managed objects in the 3D model, or a COBie import. That decision determines which information must be handed over at the end of the project.