Use case Quality assurance Permit certainty
Verify daylight provision using glazed areas
QAS-DAYLIGHT
pragmaticBIM.ch/qas-daylight
Calculate the effective glazed area for each space from the architectural model so that spaces with insufficient daylight are identified before the permit submission.
Starting point
- Window openings cannot be used directly as effective glazed areas because frames and opaque infill reduce the transparent portion.
- Without an unambiguous space assignment, windows can be allocated to the wrong space or counted more than once.
Goal & benefit
- Compare the net glazed area of each space with its floor area in a traceable manner.
- Identify deviations from the agreed cantonal or project-specific limits at an early stage.
Process
- Provide interior spaces with stable room numbers and net areas, and exterior windows with geometrically separated transparent glazing.
- Assign each exterior window to the geometrically adjacent or nearest interior space, write back the space reference, and calculate the projected net glazed area; report missing or ambiguous assignments.
- Sum the glazed areas for each space, divide them by the net space floor area, and compare the ratio with the limit configured for the project.
Deliverable
- Architectural model with a traceable space assignment and net glazed area for each exterior window.
- Space-by-space verification report showing glazed area, floor area, ratio, limit, and deviations.
Ways to do it
-
ClimateStudio Solemma editorial listing
Daylight, glare and energy simulation as a plug-in for Rhino.
Visit vendor · last checked
-
DIALux evo DIAL editorial listing
Lighting and daylight design with manufacturer luminaire data, calculation and visualisation.
Visit vendor · last checked
-
Ladybug Tools Ladybug Tools editorial listing
Open-source Grasshopper plug-ins for climate, daylight and energy simulation (Ladybug, Honeybee).
Visit vendor · last checked
-
vyzn vyzn AG editorial listing
Model-based building analysis for LCA to SIA 2032/KBOB, energy to SIA 380/1, daylight and early costs.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (7)
More use cases for Permit certainty
-
COM-QR-STAKEHOLDER-INFO
Digital resident information
Keep residents informed continuously via letter or notice with a QR code about measures and site installation, so those affected can inform themselves instead of guessing or complaining.
-
COM-STAKEHOLDER-DIALOG
Neighbourhood and stakeholder dialogue
Involve affected neighbours and authority representatives in a structured way before submission, so objections surface early rather than only in the formal objection procedure.
-
QAS-URBAN-AR
Assess the urban design on site with augmented reality
Assess the volume model and the planned trees on site with AR glasses, so urban design decisions are not taken on a figure-ground plan that omits the third dimension and the vegetation volume.