Use case Ordering Costs & quantities
Provide the basis for the flooring tender
BES-FLOORING-TENDER
pragmaticBIM.ch/bes-flooring-tender
The client orders from the architecture team a room-by-room flooring schedule with covering type, area, and perimeter from the model, so that quantities in the specification match the design and do not have to be determined again from drawings.
Starting point
- Flooring quantities and types for tendering are often assembled manually from drawings and room lists.
- When quantities for the specification are determined separately, the tender and the design drift apart; deviations only surface at final account.
Goal & benefit
- Check flooring and skirting quantities room by room and trace them back to the design.
- Use the same quantity basis for tendering, offer comparison, and invoice checking.
Process
- Define the required room-by-room information on covering type, net area, and perimeter, and the submission date, and order them from the architecture team.
- Request the room list and flooring overview and check that every interior space has a covering assigned and that the data is consistent with the tender drawings.
- Approve the overview and reuse it as the basis for the specification, offer comparison, and invoice checking.
Deliverable
- Architecture model with complete space data on use, floor covering, area, and perimeter.
- Space list and flooring overview as a verifiable tender basis.
Ways to do it
-
Archicad Graphisoft (Nemetschek) editorial listing
BIM authoring tool for architecture with drawings, schedules and IFC output from the model.
Visit vendor · last checked
-
BauPlus Heiniger & Partner AG editorial listing
Construction administration and AVA software for costs to BKP/eBKP, NPK tendering, award and measurement.
Visit vendor · last checked
-
Messerli AVA Messerli Informatik editorial listing
AVA software for tendering, contract award and billing based on NPK.
Visit vendor · last checked
-
Messerli BauAD Messerli Informatik editorial listing
CAD for building design with quantity take-off for handover to tendering (AVA).
Visit vendor · last checked
-
Revit Autodesk editorial listing
BIM authoring tool for architecture, structure and building services with drawings and quantities from the model.
Visit vendor · last checked
-
SORBA AVA SORBA editorial listing
AVA software for tendering, contract award and billing based on NPK.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
More use cases for Costs & quantities
-
BES-CONCRETE-TENDER
Provide the basis for the concrete tender
The client orders from the structural design team a model with verifiable concrete quantities and the tender-relevant information on concrete grade, reinforcement, and surface, so that the specification for concrete and reinforced concrete works is based on the same quantities as the design.
-
BES-FIRESTOP-TENDER
Provide the basis for the firestop tender
The client orders from the design team a checked firestop schedule with an unambiguous link to each opening, so that firestops are tendered with real quantities and types instead of as a percentage of construction cost.
-
BES-ELEMENT-TENDER
Prepare the tender from component types and quantities
The client orders from the design team a trade-structured tender whose items trace back to component types and model quantities, so that offers can be compared with the cost calculation and post-calculation needs no new quantity take-off.