IPD base reference
Contract-ready functional base reference with market-indexed reference costs as the basis for IPD award, fee calculation, and bonus settlement.
Contents
- Functional requirements, qualities, and indicative quantities of the base reference
- Reference costs by the agreed cost structure with price basis and indexation rule
- Delimitation of scope, assumptions, and exclusions
- Fee calculation basis derived from the reference
- Bonus and settlement rules for actual-versus-reference deviations after project completion
More documents of this discipline
-
KBE
Cost calculation
The cost calculation refines and details the cost estimate in line with the advanced technical design status and the more precise element-based quantity basis.
-
KVA
Cost estimate
The cost estimate is based on the technical design status and element-based quantities. The cost accuracy of ± 25 % indicates the confidence in the underlying assumptions, not an allowable cost deviation; contingencies and escalation must be shown separately.
-
LAY
Robotic layout file
Storey-wise layout file derived from the architecture model for robotic printing on the structural slab. It contains the lines and short texts to set out - not as a parallel 2D drawing, but as a derivation from the model status.