BIM use cases for Swiss projects

The public Swiss Starter Elementplan. Configure a project from these goals, or pick the workflows you actually run.

Template main · 2026-09-03

43 workflows

Workflow Jurisdiction
Concrete works tender from model

Prepare concrete and reinforced concrete works from the structural model for tendering.

General
Basics for tendering flooring works

Capture flooring information per space in the space model as the tender basis - without a modelled floor build-up.

General
Fit-out logistics

Print a room QR with room name and number and place it in every room - for orientation, logistics, and defect management during fit-out.

General
Reinforcement execution from model

Prepare reinforcement and edge strips from the formwork and reinforcement model for construction execution.

General
Fastening and suspension from model

Plan fastenings and suspensions from the model according to the contractor's requirements.

General
Precast concrete parts ordering from model

Provide precast concrete parts from the structural model for ordering and delivery planning.

General
Execute flooring works

Provide the modelled floor build-up with covering and subfloor for execution and quantity take-off.

General
Competition evaluation with abstractBIM

Evaluate competition entries on a comparable basis - independent of each author's modelling style and software.

General
Element-based cost calculation from abstractBIM quantities

Extract quantities early in design and iterate cost alongside the model.

General
Building performance simulation based on abstractBIM

Prepare building simulation without manually rebuilding the architecture model for simulation tools.

General
Urban design mass study

Model gross volumes per storey and extract quantities for the urban design mass study.

General
Existing site survey

Survey terrain and position reference on the existing site as the basis for demolition/new build or conversion strategies.

General
Existing structure survey

Survey and model the existing building shell as the basis for strip-back, extension, or change of use.

General
Existing MEP survey

Survey and model existing building services for change of use or targeted replacement.

General
Ceiling mirror planning

Interior finishes - maintain suspended ceilings in the model, from early room assignment through execution-grade layer modelling for MEP coordination.

General
Facade planning

Maintain the building envelope in the model - from early multi-layer construction through execution-grade facade layers for quantity take-off and building...

General
Basic services piping planning

Coordinate drainage and wastewater early in the model - before clashes in risers and below ceilings trigger costly design changes.

General
FM - Minimal data delivery

Deliver space and door lists plus FM-relevant building services as structured data at handover to the operator - without full 3D plant modelling.

General
Layout planning for decision-making

Maintain the spatial layout early in the model and decide on options - spaces only, optionally symbolic doors.

General
Derive door planning foundations from the model

Derive door planning foundations from the model - dimensions, door type, and opening direction for door schedules and coordination.

General
FM - Delivery of 3D information

Agree with the operator which objects they actually manage - and hand over only those with the agreed master data in the 3D model.

General
Parking verification from the model

Model parking spaces as dedicated spaces from building design onward and evaluate count and areas directly from the model.

General
Determine floor area from the model

Model storey volumes and air spaces and derive floor area from storey volume minus air space.

General
Full life-cycle calculation (LCA) from the model

Carry component quantities and materials in the model so a full LCA is possible without parallel quantity lists.

General
Visualizations for usage agreements from the model

Hold usage-agreement requirements (SIA 260) per space in the model and derive readable visualizations from them.

General
Area verification according to SIA 416

SIA 416 area verification from the space model - area class via Reference, use via LongName.

Switzerland
Area verification according to SIA D0165

SIA D0165 area verification from the space model - area class via Reference, use via LongName.

Switzerland
Managing the signage room number

Maintain and update signage room numbers in operation - separate from the technical planning room number.

General
Plan coordination zones

Which areas are coordinated in which coordination meeting - instead of everything against everything.

General
Early design stage coordination

Align concept and feasibility early in the model - comparable to a sketch design, without execution detail.

General
MEP detail coordination

Coordinate building services from construction project phase with IFC entities and PredefinedType - no longer schematic only.

General
Control of exclusion zones and structural sketch

Verify the exclusion zone model and structural sketch in the federated model - before planning runs into restricted zones.

General
Architecture - MEP coordination in later phases (structural openings)

Coordinate architecture and MEP in later phases and carry openings and recesses bindingly in the structural model.

General
Architecture - structural coordination

Align load-bearing components between architecture and structural models - as previously done on 2D concrete pouring plans, now in the model.

General
Special room user coordination

Sketch special rooms quickly and roughly in the model and align them with users - no formal modelling guidelines, for meetings and visualization.

General
Detail reference overview

Like detail references in 2D sections, the detail reference overview shows in 3D where each standard detail applies - to spot planning gaps quickly and...

General
Common model reference for planning and construction

Establish a shared, georeferenced model reference from the start - most coordination mistakes happen because models are not aligned; fixing later is...

General
QA fire protection component values

Maintain fire resistance classes in the architecture model from the end of the building project phase and check them against the fire protection concept.

General
QA acoustics / building physics component values

Maintain sound reduction values Rw in the architecture model from the end of the building project phase and check them against acoustic planning.

General
Control and verification of installation access paths

Maintain clear installation access paths in the model and prove them clash-free - before large equipment or components can no longer be brought in.

General
Verification of maintenance spaces

Maintain clear maintenance spaces in the model and prove them clash-free - before plant becomes unmaintainable.

General
Verification of space demand / floor-area impact of facing shells

Carry the usable space of facing shells in the model and prove floor-area impact - before wet rooms become too small.

General
End-of-phase design review

Design review at the end of each project phase - check planning quality and maturity, record open points, and document release for the next phase.