Basic services piping planning

DES-BASIC-PIPING · General · Design

Coordinate drainage and wastewater early in the model - before clashes in risers and below ceilings trigger costly design changes.

Starting point

  • Roof drainage, downpipes, and wastewater are often planned late; clashes with structure and MEP become hard to resolve.
  • Balcony drainage is frequently forgotten and leads to change orders during execution planning.

Goal & benefit

  • Model the drainage path from roof and balcony through downpipes to wastewater mains early and traceably.
  • Check risers, penetrations, and space requirements before detailed planning.

Process

  1. Model tapered insulation on flat roof and balcony with falls; derive drainage points from the fall layout.
  2. Route downpipes from roof and balconies to the main collector.
  3. Coordinate wastewater pipes in risers and main routes; check for clashes in the federated model.

Outcome

  • Coordinated drainage and wastewater route as the basis for detailed sanitary planning.

Deliverables

  • Architecture and MEP models with IfcProject, IfcSite, IfcBuilding, and IfcBuildingStorey
  • IfcCovering with PredefinedType=ROOFING - tapered insulation on flat roof and balcony with falls
  • IfcPipeSegment with Reference=FL - downpipes from roof and balconies
  • IfcPipeSegment with Reference=AW, WW, or ENT - wastewater pipes in risers and main routes
  • IfcSpace with PredefinedType=EXTERNAL - balconies and terraces as drainage starting points