pragmaticBIM
Start defining

← All use cases

Layout planning for decision-making

DES-LAYOUT · General · Design

Maintain the spatial layout early in the model and decide on options - spaces only, optionally symbolic doors.

Starting point

  • Layout decisions (subdivision, circulation, daylight) need early 3D orientation; full element modelling is too heavy at this stage.
  • 2D plans alone make option comparison and alignment with client and users harder.

Goal & benefit

  • Model only space volumes to check size, location, and subdivision early.
  • Optionally add doors symbolically - with PredefinedType and approximate location.

Process

  1. Provide interior spaces as volumes with use and dimensions; optionally exterior spaces for balconies and terraces.
  2. Where needed, place doors with PredefinedType symbolically - without execution detail.
  3. Compare options.

Outcome

  • Coordinated spatial layout as a decision basis - without wall or fit-out modelling.

Deliverables

  • Architecture model with IfcProject, IfcSite, IfcBuilding, and IfcBuildingStorey
  • Interior spaces as modelled IfcSpace volumes (PredefinedType=INTERNAL); LongName with use; NetFloorArea as size indication
  • Optional: exterior spaces (IfcSpace, PredefinedType=EXTERNAL) for balconies and terraces
  • Optional early: symbolic IfcDoor - PredefinedType and approximate location

Activated by project goals

Related workflows

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel