Fastening and suspension from model
CON-FASTEN-SUSP · General · Construction
Plan fastenings and suspensions from the model according to the contractor's requirements.
Starting point
- Fastenings and suspensions are often improvised on site; materials and positions are missing from early planning.
- Without an agreed model delivery it is unclear which geometry and data the contractor needs for fastening planning.
Goal & benefit
- Deliver the coordinated structural and MEP model stage by stage as the basis for fastening and suspension planning.
- Detailed design, product selection, and bills of materials remain with the contractor or supplier.
Process
- Provide the coordinated structural and MEP model per stage as agreed with the contractor.
- Agree with the contractor the common model reference and the delivery scope needed for fastening planning.
- Use the model for planning, bills of materials, and where applicable layout of fastening points.
Outcome
- Executable fastening and suspension planning from the model by the contractor or supplier.
Deliverables
- Structural model (host components: slabs, walls, beams) and MEP model (systems to be fixed) with geometry
- Common model reference (reference points)
- Further attributes, loads, materials, and filtering as agreed with the contractor
- No Elementplan definition of product fastening means (channels, anchors, hangers)
Activated by project goals
- Schedule criticality · high