pragmaticBIM
Start defining

← All use cases

Dealing with existing stock

PG-06 · General

Controls survey and modelling depth on existing assets (terrain, structure, MEP) for strategies from demolition/new build through strip-back to structure with extension to change of use while retaining building services.

Levels

  1. New build

    Terrain survey - existing building will be demolished (demolition/new build).

    This level adds

    Active at this level

  2. Structure retained

    Additionally survey and model the structure - e.g. refurbishment, extension, strip-back to structure.

    This level adds

    Active at this level

  3. Building services retained

    Additionally survey and model building services - e.g. conversion, change of use while retaining services.

    This level adds

    Active at this level

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel