Cost/budget sensitivity
PG-01 · General
Controls quantity, cost and tendering depth via ordered levels.
Levels
-
low
Area verification according to SIA 416 on the space model.
This level adds
Active at this level
-
medium
Element-based cost calculation from abstractBIM quantities.
This level adds
Active at this level
-
high
Concrete works tender from model in addition to abstractBIM cost calculation.
This level adds
Active at this level