Schedule criticality
PG-05 · General
Controls coordination depth and schedule-relevant model alignment via ordered levels.
Levels
-
low
No additional schedule-related workflows.
This level adds
No additional workflow at this level.
-
medium
Architecture - MEP coordination in later phases including structural openings.
This level adds
Active at this level
-
high
Deeper coordination (early, structure incl. exclusion zone QS and formwork-plan coordination, MEP detail), verification of installation paths and maintenance spaces, fit-out logistics with room QR, plus reinforcement execution, fastening/suspension, and precast concrete ordering from model.
This level adds
- Early design stage coordination
- Control of exclusion zones and structural sketch
- Architecture - structural coordination
- MEP detail coordination
- Control and verification of installation access paths
- Verification of maintenance spaces
- Fit-out logistics
- Reinforcement execution from model
- Fastening and suspension from model
- Precast concrete parts ordering from model
Active at this level
- Architecture - MEP coordination in later phases (structural openings)
- Early design stage coordination
- Control of exclusion zones and structural sketch
- Architecture - structural coordination
- MEP detail coordination
- Control and verification of installation access paths
- Verification of maintenance spaces
- Fit-out logistics
- Reinforcement execution from model
- Fastening and suspension from model
- Precast concrete parts ordering from model