Derive door planning foundations from the model
DES-DOOR · General · Design
Derive door planning foundations from the model - dimensions, door type, and opening direction for door schedules and coordination.
Starting point
- After layout decisions, structured door data is often missing for schedules, quantities, and coordination.
- Doors are frequently planned in 2D; dimensions and opening direction are not traceable in the model.
Goal & benefit
- Maintain doors in the model with dimensions, PredefinedType, and OperationType.
- Derive door planning foundations for schedules, option comparison, and coordination.
Process
- Provide the spatial layout and symbolic doors from layout planning.
- Add OverallWidth, OverallHeight, PredefinedType, and OperationType on doors.
- Derive and align door schedules and planning foundations from the model.
Outcome
- Coordinated door planning foundations from the model - without execution-grade component detail.
Deliverables
- Architecture model with IfcProject, IfcSite, IfcBuilding, and IfcBuildingStorey
- Interior spaces as modelled IfcSpace volumes (PredefinedType=INTERNAL)
- IfcDoor with PredefinedType, OverallWidth, OverallHeight, and OperationType (opening direction)
Activated by project goals
- Fit-out standard · elevated