← All use cases

Furnishability verification

QAS-FURNISHABILITY · General · Quality assurance

Prove in the model that interior rooms remain furnishable - before walls and openings lock in the use.

Starting point

  • Without furniture in the model, it stays unclear whether rooms with the intended use can actually be furnished.
  • Late conflicts with walls, doors, and circulation lead to rebuilds or unusable layouts.

Goal & benefit

  • Maintain furniture as simplified bodies with real dimensions in the model.
  • Check fit and circulation against room and building and document the verification.

Process

  1. Provide interior spaces with use and dimensions.
  2. Place furniture schematically with real footprint and height.
  3. Check fit and clashes and document the verification.

Outcome

  • Verified furnishability as the planning basis - before the layout becomes binding.

Deliverables

  • Architecture model with IfcProject, IfcSite, IfcBuilding, and IfcBuildingStorey
  • Interior spaces as modelled IfcSpace volumes (PredefinedType=INTERNAL); LongName with use; NetFloorArea as size indication
  • IfcFurniture with Name and PredefinedType (IFC4+) or IfcFurnishingElement with ObjectType (IFC2x3); schematic geometry with real footprint

Activated by project goals

Related workflows

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel