|
Concrete works tender from model
Prepare concrete and reinforced concrete works from the structural model for tendering.
|
BES-CONCRETE-TENDER
|
Ordering
|
General
|
|
|
Basics for tendering flooring works
Capture flooring information per space in the space model as the tender basis - without a modelled floor build-up.
|
BES-FLOORING-TENDER
|
Ordering
|
General
|
|
|
Manage and visualize tenant fit-out / base-building cost interfaces
Carry the cost bearer per component in the model (GAB vs MAB{tenant}) and derive coloured plans and quantities for tendering from it.
|
BES-COST-INTERFACE
|
Ordering
|
General
|
|
|
Visualize award interfaces
Carry award packages per component in the model and colour them - forgotten parts at contractor interfaces become visible.
|
BES-AWARD-INTERFACE
|
Ordering
|
General
|
|
|
Competition evaluation with abstractBIM
Evaluate competition entries on a comparable basis - independent of each author's modelling style and software.
|
BES-ABSTRACTBIM-COMP
|
Ordering
|
General
|
|
|
Fit-out logistics
Print a room QR with room name and number and place it in every room - for orientation, logistics, and defect management during fit-out.
|
CON-LOGISTICS-FITOUT
|
Construction
|
General
|
|
|
Reinforcement execution from model
Prepare reinforcement and edge strips from the formwork and reinforcement model for construction execution.
|
CON-REINF-EXEC
|
Construction
|
General
|
|
|
Fastening and suspension from model
Plan fastenings and suspensions from the model according to the contractor's requirements.
|
CON-FASTEN-SUSP
|
Construction
|
General
|
|
|
Precast concrete parts ordering from model
Provide precast concrete parts from the structural model for ordering and delivery planning.
|
CON-PRECAST-ORDER
|
Construction
|
General
|
|
|
Execute flooring works
Provide the modelled floor build-up with covering and subfloor for execution and quantity take-off.
|
CON-FLOORING-EXEC
|
Construction
|
General
|
|
|
Create formwork and reinforcement plans
Derive formwork and reinforcement plans for concrete execution from the structural model.
|
CON-SHL-BWP
|
Construction
|
General
|
|
|
Element-based cost calculation from abstractBIM quantities
Extract quantities early in design and iterate cost alongside the model.
|
DES-ABSTRACTBIM-COST
|
Design
|
General
|
|
|
Building performance simulation based on abstractBIM
Prepare building simulation without manually rebuilding the architecture model for simulation tools.
|
DES-ABSTRACTBIM-BPS
|
Design
|
General
|
|
|
Urban design mass study
Model gross volumes per storey and extract quantities for the urban design mass study.
|
DES-URBAN-MASS
|
Design
|
General
|
|
|
Existing site survey
Survey terrain and position reference on the existing site as the basis for demolition/new build or conversion strategies.
|
DES-EXISTING-SITE
|
Design
|
General
|
|
|
Managing existing, demolition, new and temporary with models
Split models by existing, demolish, new and temporary - so it is immediately clear what is new and what is removed, and whole models can be toggled on and...
|
DES-EXISTING-MODELS
|
Design
|
General
|
|
|
Existing structure survey
Survey and model the existing building shell as the basis for strip-back, extension, or change of use.
|
DES-EXISTING-STRUCTURE
|
Design
|
General
|
|
|
Existing MEP survey
Survey and model existing building services for change of use or targeted replacement.
|
DES-EXISTING-MEP
|
Design
|
General
|
|
|
Ceiling mirror planning
Interior finishes - maintain suspended ceilings in the model, from early room assignment through execution-grade layer modelling for MEP coordination.
|
DES-CEILING-MIRROR
|
Design
|
General
|
|
|
Facade planning
Maintain the building envelope in the model - from early multi-layer construction through execution-grade facade layers for quantity take-off and building...
|
DES-FACADE
|
Design
|
General
|
|
|
Basic services piping planning
Coordinate drainage and wastewater early in the model - before clashes in risers and below ceilings trigger costly design changes.
|
DES-BASIC-PIPING
|
Design
|
General
|
|
|
FM - Minimal data delivery
Deliver space and door lists plus FM-relevant building services as structured data at handover to the operator - without full 3D plant modelling.
|
HOV-FM-MIN
|
Handover
|
General
|
|
|
Layout planning for decision-making
Maintain the spatial layout early in the model and decide on options - spaces only, optionally symbolic doors.
|
DES-LAYOUT
|
Design
|
General
|
|
|
Derive door planning foundations from the model
Derive door planning foundations from the model - dimensions, door type, and opening direction for door schedules and coordination.
|
DES-DOOR
|
Design
|
General
|
|
|
FM - Delivery of 3D information
Agree with the operator which objects they actually manage - and hand over only those with the agreed master data in the 3D model.
|
HOV-FM-3D
|
Handover
|
General
|
|
|
Parking verification from the model
Model parking spaces as dedicated spaces from building design onward and evaluate count and areas directly from the model.
|
DES-PARKING
|
Design
|
General
|
|
|
Determine floor area from the model
Model storey volumes and air spaces and derive floor area from storey volume minus air space.
|
DES-GFA
|
Design
|
General
|
|
|
Full life-cycle calculation (LCA) from the model
Carry component quantities and materials in the model so a full LCA is possible without parallel quantity lists.
|
DES-LCA
|
Design
|
General
|
|
|
Visualizations for usage agreements from the model
Hold usage-agreement requirements per space in the model and derive readable visualizations from them.
|
DES-USAGE-AGREEMENT
|
Design
|
General
|
|
|
Area verification according to SIA 416
SIA 416 area verification from the space model - area class via Reference, use via LongName.
|
DES-SIA416
|
Design
|
Switzerland
|
|
|
Area verification according to SIA D0165
SIA D0165 area verification from the space model - area class via Reference, use via LongName.
|
DES-D0165
|
Design
|
Switzerland
|
|
|
Furniture planning
Maintain furniture in the model and decide location and type - schematically, without a product catalogue.
|
DES-FURNITURE
|
Design
|
General
|
|
|
Visualize planning interfaces
Carry planning responsibility per component in the model and colour it - forgotten parts at planning interfaces become visible.
|
DES-PLANNING-INTERFACE
|
Design
|
General
|
|
|
Automatically calculate eBKP-H classification for major positions
Derive eBKP-H codes for major architecture and MEP positions from a few model properties - instead of classifying by hand.
|
DES-EBKP-H
|
Design
|
Switzerland
|
|
|
Managing the signage room number
Maintain and update signage room numbers in operation - separate from the technical planning room number.
|
OPR-SIGNAGE-ROOM
|
Operation
|
General
|
|
|
Drawing derivation from the 3D model
Derive drawings from the 3D model and read them as a completeness check against the IFC model.
|
DES-DRAWINGS
|
Design
|
General
|
|
|
Develop the fire protection concept
Develop the fire protection concept and fire plan as the binding basis for permit and model values.
|
DES-FIRE-CONCEPT
|
Design
|
General
|
|
|
Create the building physics concept
Set the building physics component catalogue with values for the envelope and separating components.
|
DES-PHYSICS
|
Design
|
General
|
|
|
Prepare the building application
Derive architecture and MEP permit plans for the building application from the planning status.
|
DES-PERMIT
|
Design
|
Switzerland
|
|
|
Develop MEP schematics
Develop MEP system and riser schematics and formally approve them before construction.
|
DES-MEP-SCHEM
|
Design
|
General
|
|
|
Develop the fire-case control matrix
Formally approve the fire-case control matrix for detectors, dampers, actuators, and suppression equipment before construction.
|
DES-FIRE-MATRIX
|
Design
|
General
|
|
|
Prepare the traffic study
Prepare the traffic study for access, parking, and network effects as the basis for the building application.
|
DES-TRAFFIC
|
Design
|
General
|
|
|
Prepare the environmental impact assessment
Prepare the environmental impact assessment of the project's effects on the environment and surroundings as the basis for the building application.
|
DES-UVP
|
Design
|
General
|
|
|
Plan coordination zones
Which areas are coordinated in which coordination meeting - instead of everything against everything.
|
QAS-COORD-ZONE
|
Quality assurance
|
General
|
|
|
Early design stage coordination
Align concept and feasibility early in the model - comparable to a sketch design, without execution detail.
|
QAS-EARLY-COORD
|
Quality assurance
|
General
|
|
|
MEP detail coordination
Coordinate building services from construction project phase with IFC entities and PredefinedType - no longer schematic only.
|
QAS-MEP-DETAIL
|
Quality assurance
|
General
|
|
|
Control of exclusion zones and structural sketch
Verify the exclusion zone model and structural sketch in the federated model - before planning runs into restricted zones.
|
QAS-EXCL-ZONE
|
Quality assurance
|
General
|
|
|
Architecture - MEP coordination in later phases (structural openings)
Coordinate architecture and MEP in later phases and carry openings and recesses bindingly in the structural model.
|
QAS-ARCH-MEP-OPENINGS
|
Quality assurance
|
General
|
|
|
Architecture - structural coordination
Align load-bearing components between architecture and structural models - as previously done on 2D concrete pouring plans, now in the model.
|
QAS-ARCH-STRUCT-COORD
|
Quality assurance
|
General
|
|
|
Special room user coordination
Sketch special rooms quickly and roughly in the model and align them with users - no formal modelling guidelines, for meetings and visualization.
|
QAS-SPECIAL-ROOM-USER
|
Quality assurance
|
General
|
|
|
Detail reference overview
Like detail references in 2D sections, the detail reference overview shows in 3D where each standard detail applies - to spot planning gaps quickly and...
|
QAS-DET-REF
|
Quality assurance
|
General
|
|
|
Common model reference for planning and construction
Establish a shared, georeferenced model reference from the start - most coordination mistakes happen because models are not aligned; fixing later is...
|
QAS-MODEL-REF
|
Quality assurance
|
General
|
|
|
QA fire protection component values
Maintain fire resistance classes in the architecture model from the end of the building project phase and check them against the fire protection concept.
|
QAS-FIRE
|
Quality assurance
|
General
|
|
|
QA acoustics / building physics component values
Maintain sound reduction values Rw in the architecture model from the end of the building project phase and check them against acoustic planning.
|
QAS-ACOUSTIC
|
Quality assurance
|
General
|
|
|
Control and verification of installation access paths
Maintain clear installation access paths in the model and prove them clash-free - before large equipment or components can no longer be brought in.
|
QAS-INSTALL-PATH
|
Quality assurance
|
General
|
|
|
Verification of maintenance spaces
Maintain clear maintenance spaces in the model and prove them clash-free - before plant becomes unmaintainable.
|
QAS-MAINT-SPACE
|
Quality assurance
|
General
|
|
|
Verification of space demand / floor-area impact of facing shells
Carry the usable space of facing shells in the model and prove floor-area impact - before wet rooms become too small.
|
QAS-VORSATZ
|
Quality assurance
|
General
|
|
|
End-of-phase design review
Design review at the end of each project phase - check planning quality and maturity, record open points, and document release for the next phase.
|
QAS-DESIGN-REVIEW
|
Quality assurance
|
General
|
|
|
Furnishability verification
Prove in the model that interior rooms remain furnishable - before walls and openings lock in the use.
|
QAS-FURNISHABILITY
|
Quality assurance
|
General
|
|