PG-01 · General
Controls quantity, cost and tendering depth via ordered levels.
Levels
-
Low
Area verification according to SIA 416 on the space model and urban design mass study with gross volumes.
This level adds
Active at this level
-
Medium
Element-based cost calculation from abstractBIM quantities, automated eBKP-H classification, and visualization of planning interfaces.
This level adds
- Area verification according to SIA 416
- Urban design mass study
- Element-based cost calculation from abstractBIM quantities
- Automatically calculate eBKP-H classification for major positions
- Visualize planning interfaces
Active at this level
-
High
Concrete and flooring works tender from model plus visualization of award and cost interfaces (base building/tenant fit-out).
This level adds
- Area verification according to SIA 416
- Urban design mass study
- Element-based cost calculation from abstractBIM quantities
- Automatically calculate eBKP-H classification for major positions
- Visualize planning interfaces
- Concrete works tender from model
- Basics for tendering flooring works
- Visualize award interfaces
- Manage and visualize tenant fit-out / base-building cost interfaces
Active at this level
- Area verification according to SIA 416
- Urban design mass study
- Element-based cost calculation from abstractBIM quantities
- Automatically calculate eBKP-H classification for major positions
- Visualize planning interfaces
- Concrete works tender from model
- Basics for tendering flooring works
- Visualize award interfaces
- Manage and visualize tenant fit-out / base-building cost interfaces