Cost/budget sensitivity

PG-01 · General

Controls quantity, cost and tendering depth via ordered levels.

Levels

  1. Low

    Area verification according to SIA 416 on the space model and urban design mass study with gross volumes.

    This level adds

    Active at this level

  2. Medium

    Element-based cost calculation from abstractBIM quantities, automated eBKP-H classification, and visualization of planning interfaces.

    This level adds

    Active at this level

  3. High

    Concrete and flooring works tender from model plus visualization of award and cost interfaces (base building/tenant fit-out).

    This level adds

    Active at this level