Manage and visualize tenant fit-out / base-building cost interfaces
BES-COST-INTERFACE · General · Ordering
Carry the cost bearer per component in the model (GAB vs MAB_{tenant}) and derive coloured plans and quantities for tendering from it.
Starting point
- The cost interface between base building and tenant fit-out is often kept only in lists, drawings, or contracts - hard to align with the model.
- Without a clear assignment per component, landlord and tenant quantities and positions mix in the tender.
Goal & benefit
- Assign every architecture and MEP component to a cost bearer: base building or a named tenant fit-out.
- Derive coloured plans, filters, and quantities by cost interface directly from the model.
Process
- Provide architecture and MEP components in the discipline model.
- Set CostInterface:
GABorMAB_{tenant name}(one value per component). - Derive visualizations and quantities by cost interface from the model.
Outcome
- Checkable cost interface per component as the basis for tender, quantities, and visualization of base building and tenant fit-out.
Deliverables
- Architecture and MEP models with the modelled components
- CostInterface (ePset_Cost):
GABorMAB_{tenant name}(e.g.MAB_Migros)
Activated by project goals
- Cost/budget sensitivity · High