The public Swiss Starter Elementplan. Set goal intensity so workflows and required elements follow, or pick the workflows you actually run.

Template v1.1.0 · 2026-09-06

Plans, reports, and contracts linked to a domain.

32 documents

Document Description
Floor plans

GRD

Storey floor plans as the geometric and visual planning basis. They act as a completeness check against the IFC model - the model is validated via IDS, the plans show whether the status is complete and readable.
Sections

SCT

Building sections as the geometric and visual planning basis. They act as a completeness check against the IFC model - heights, layers, and vertical relationships must be readable on the drawing.
Elevations

ANS

Building elevations as the geometric and visual planning basis. They act as a completeness check against the IFC model - facade, openings, and junctions must be readable on the drawing.
Details

DET

Standard and execution details as the geometric planning basis. They close the gap between model and construction and act as a completeness check where the IFC model is not held at detail depth.
Fire protection plan

BSP

Fire protection plan with compartments, escape routes, and fire resistance of the governing components. It supports alignment with the fire concept and permit documents.
Fire protection concept

BSK

Fire protection concept with protection goals, compartments, and required fire-resistance classes. Binding basis for the fire plan, model values, and permit.
Terrain survey

GLD

Terrain survey with position and height reference in LV95 and control points. Binding spatial basis for all discipline models; complemented by the geotechnical report.
Geotechnical report

BDG

Geotechnical report with subsoil, bearing capacity, and geotechnical recommendations. It complements the terrain survey and position reference as the basis for foundations, excavation, and strategy choice.
Traffic study

VKG

Traffic study for access, parking, and effects on the surrounding network. Basis for the building application and alignment with the authority.
Environmental impact assessment

UVP

Environmental impact assessment of the project's effects on the environment and surroundings. Basis for the building application and alignment with the authority.
Formwork plans

SHL

Formwork plans for concrete execution. They make formwork, dimensions, and junctions readable for site.
Reinforcement plans

BWP

Reinforcement plans for concrete execution. They make bars, layers, and positions readable for site.
Permit plans architecture

BGA

Architecture permit plans for the building application. Floor plans, sections, and elevations in the representation required by the authority.
Permit plans heating

BGH

Heating permit plans for the building application. Representation of the heating systems in the form required by the authority.
Permit plans cooling

BGK

Cooling permit plans for the building application. Representation of the cooling systems in the form required by the authority.
Permit plans ventilation

BGL

Ventilation permit plans for the building application. Representation of the ventilation systems in the form required by the authority.
Permit plans air conditioning

BGC

Air-conditioning permit plans for the building application. Representation of the air-conditioning systems in the form required by the authority.
Permit plans plumbing

BGS

Plumbing permit plans for the building application. Representation of the plumbing systems in the form required by the authority.
Permit plans electrical

BGE

Electrical permit plans for the building application. Representation of the electrical systems in the form required by the authority.
System and plant schematics (MEP)

SYS

MEP system and plant schematics (heating, ventilation, air conditioning, plumbing, electrical). They ensure building-services concepts are formally approved before construction.
Riser schematics / shafts

STG

Riser schematics and shafts for building services. They ensure vertical distribution and shafts are formally approved before construction.
Fire-case control matrix

BSM

Fire-case control matrix for detectors, dampers, actuators, and suppression equipment. It ensures the safety matrix is formally approved before construction.
Project handbook / BEP

BAP

Project handbook and BIM execution plan. It links organisational milestones - roles, processes, deliverables - directly to the technical planning status.
Usage agreement structure

NVT

Structural usage agreement according to SIA 260. It links agreed uses, loads, and vibration requirements per space to the technical planning status of the structure.
Usage agreement MEP

NVG

MEP usage agreement. It links agreed room-wise requirements for heating, ventilation, air conditioning, plumbing, and electrical to the technical planning status.
Cost estimate / cost calculation

KVA

Cost estimate and cost calculation. It links commercial milestones directly to the technical planning status and model-based quantities.
Bills of quantities

LV

Bills of quantities for tender and award. They link commercial milestones directly to the technical planning status.
Works contracts

WVK

Works contracts with contractors. They link commercial milestones directly to the technical planning status that underpins the award.
Minutes

PRT

Meeting and decision minutes. They link organisational milestones and decisions directly to the technical planning status.
Daywork reports

RGR

Daywork reports for time-and-material work. They prevent unplanned extra cost by coupling daywork directly to the affected milestones and containers (project, site, building, storey).
Change requests

CRQ

Change orders and variations. They prevent unplanned extra cost by coupling variations directly to the affected milestones and containers (project, site, building, storey).
Building physics component catalogue

BPK

Building physics component catalogue with values for the envelope and separating components. Basis for verification, variants, and coordination with architecture and specialists.