← All use cases

Duct (schematic)

MEP-SCH-DUCT

Schematic duct for early coordination - medium in Reference.

Description

  • Simplified segment or volume for main duct routes (supply / extract, etc.).
  • Used for feasibility and clash checking, not for execution planning.

Modelling guidelines

  • Model as a volume or simplified segment; cross-section according to the sketch concept.
  • Set the medium in Reference (e.g. ZU, AB).
  • Do not model fittings, fire dampers, or connection details.

Attributes

Name Description Unit
Reference

Pset_DuctSegmentTypeCommon

Medium of the schematic duct.

Allowed values

  • ZU - supply air
  • AB - extract air
  • AU - outdoor air
  • FO - exhaust air
GrossCrossSectionArea

Qto_DuctSegmentBaseQuantities

Cross-sectional area of the modelled schematic duct.

Status

Pset_DuctSegmentTypeCommon

Element status for coordination on existing buildings.

Allowed values

  • NEW - new
  • EXISTING - existing
  • DEMOLISH - to demolish
  • TEMPORARY - temporary
ElementStatus

ePset_ElementStatus

Element status for coordination on existing buildings.

Allowed values

  • NEW - new
  • EXISTING - existing
  • DEMOLISH - to demolish
  • TEMPORARY - temporary

Note

  • IFC2x3 substitute for Status.

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel